Road Repairs in Chelmsford

We carry out road repairs on private roads, estate roads and site roads around Chelmsford, laid to the same specification as our council contracts. Family run business, over 50 years in surfacing, based just down the road in Blackmore.

✓ Fully guaranteed✓ £10m insured✓ 0% finance available

Road repairs in Chelmsford, laid to council specification

We do road repairs in Chelmsford for the people who own the roads nobody else looks after: residents on private estates, management companies, businesses with their own site roads, and anyone at the far end of a long shared access lane. We’re main contractors for local authorities, and a private road repair gets the same mixes, the same prep and the same crew as our council work.

We’re based in Blackmore, a short drive out of Chelmsford, so coming to look at your road isn’t a day trip for us. We’ve carried out a tarmac road repair in Chelmsford itself with full traffic management in place, and some of the photos here are from that job. Harrington Brothers is a family run business with over 50 years in surfacing, and about 90% of our work comes from referrals and repeat customers. That number only stays that high if the repairs stay put.

Is it your road to repair, or the council’s?

Settle this before you ring anyone, us included. If the road is adopted (taken on and maintained by the highway authority), Essex County Council looks after it through Essex Highways, and you shouldn’t be paying a contractor to fix it. Report the defect on the Essex Highways report a problem page and let them deal with it. We’d rather tell you that than take your money.

Unadopted roads are a different story. Private estate roads, shared drives serving a handful of houses, roads inside business parks and access lanes are normally the responsibility of whoever owns them. Often that’s split between the residents, or handled by a management company, and the deeds or management agreement usually say who pays for what.

If you’re not sure if your road is adopted, Essex Highways can tell you.

One tip for shared roads: get everyone who’s paying to agree the scope before the survey, not after it. We’ll happily walk the road with a residents’ committee and explain what needs doing now and what can wait. That half hour saves a lot of arguments over the garden fence later.

Patch, resurface or rebuild: what your road actually needs

Most road repair work falls into one of three jobs. Which one you need depends on what’s happening underneath, not on how bad the top looks.

Patch repairs

If the road is sound apart from a few potholes or failed areas, we cut those out square, take them down to solid material and reinstate them in hot laid tarmac. That’s the right call for a road that’s mostly fine. For one or two holes, our pothole repairs in Chelmsford page goes into more detail.

Resurfacing

When the surface is crazed with cracks, or patched so often it looks like a quilt, but the base underneath is still holding up, we take off the worn top layer and lay a new wearing course. You get a sound, sealed road without paying to rebuild what’s still doing its job.

Full reconstruction

Ruts in the wheel tracks, edges breaking away, water sitting in the same dips after every shower: those are signs the base has gone. New tarmac over a failed base is money thrown away, because it follows the old shape within two or three years. Here we dig out, rebuild with a compacted MOT Type 1 sub-base (crushed stone, rolled solid) and lay new base and wearing courses.

Plenty of roads need a bit of all three. A residents’ group might have a sound stretch, a section that needs a new top and a corner where the lorries turn that has to be rebuilt. We’ll price each part separately so you can see where the money goes.

How we carry out a road repair, start to finish

  1. Free survey. We walk the road, look at the base where it’s broken open, check where the water goes and measure up. You get a fixed quote in writing afterwards.
  2. Traffic management. Barriers and signs go up first, with full traffic management where the road needs it, as on our other Chelmsford road repairs. On roads that can’t close we work in sections, and we’ve done night work in London to keep roads open during the day.
  3. Cutting and breaking out. We cut the edges square and break out the old surface. This is the noisy part: you’ll hear the breaker and the plant for a while, and there’ll be a lorry taking the old material away.
  4. Checking the base. Once it’s open we can see what the road is sitting on. Soft spots get dug out and rebuilt with compacted MOT Type 1.
  5. Tack coat and new tarmac. The edges and base get a tack coat (a bitumen spray that sticks new to old), then hot laid tarmac goes in, base course first and wearing course on top, rolled while it’s hot. After that it’s mostly the roller and the smell of hot bitumen.
  6. Bitumen overbanding. Every joint between new and old tarmac gets sealed with bitumen overbanding, so water can’t get in and start the next pothole.
  7. Lining. If there were road markings, we put them back in thermoplastic.

 

For the wearing course we pick the mix to suit the traffic. A 55/10 HRA mix (a dense, heavier duty hot rolled mix) or 10mm DBM is what we normally use on roads that take vans and lorries, and footpaths alongside get 6mm DBM. A quiet residential cul de sac and a yard full of delivery lorries don’t need the same thing, and we’ll tell you which yours needs and why.

Where cheap road repairs cut corners

We get asked to look at a lot of roads that were repaired last year. The story is nearly always the same.

  • Cold lay in a wheelbarrow. Bagged cold lay shovelled into a wet hole and tamped down with a boot. It’s fine as an emergency stopgap. As a road repair, it won’t see out the winter.
  • No square edges. If the hole isn’t cut back to sound material, the new tarmac is bonding to crumbling edges and will pop out again.
  • No tack coat. Without it the patch just sits in the hole instead of sticking to it.
  • No overbanding. Open joints let water in. Add a hard frost and you’ve got a new pothole next to the old one.
  • Tarmac over a failed base. Looks smart on handover day, then follows the old ruts within a couple of winters.

 

None of those shortcuts saves much on the day. They just move the bill to next year, usually with a bigger number on it. If you’ve had two quotes that are miles apart, ask both contractors whether they’re cutting the edges, using a tack coat and overbanding the joints. The answers usually explain the gap.

Who we carry out road repairs for

Our road repair customers around Chelmsford, Danbury, Maldon, Witham, Braintree and Ingatestone tend to be one of these:

  • residents and management companies on private, unadopted estate roads
  • businesses with their own site roads, yards and access roads
  • owners of shared access lanes serving a few properties
  • landlords and agents looking after commercial premises

 

On the public side, we’re main contractors for local authorities including Hertsmere Borough Council, the London Borough of Barnet, Tower Hamlets Council and Brentwood Borough Council. We hold Constructionline and SafeContractor approval and CHAS accreditation, we’re registered with CIRAS and RISQS, and we carry ten million pounds of public liability insurance. For a private road that means a crew used to working to a written specification, which is exactly what you want when a group of neighbours is splitting the bill. You can read more about our wider road repairs and resurfacing work, or see how roads get finished on our line marking in Chelmsford page.

What road repairs cost in Chelmsford

We don’t publish a price for road repairs, because two roads the same length can be miles apart in cost. What moves the number:

  • the area and depth of what needs digging out
  • whether the sub-base has failed and needs rebuilding
  • the mix the traffic calls for
  • traffic management, which on a busy road is a real part of the cost
  • access for plant and lorries
  • whether road markings need putting back

 

For a single small pothole, under about 1 m², we can sometimes give you a rough idea from photos. Anything bigger needs a proper look. The survey is free, with no hassle and no obligation, and you’ll get a fixed quote in writing. Call us on 01277 546016 or ask us to call you back.

Road Repairs in Chelmsford: your questions

Who is responsible for repairing a private road?

Usually whoever owns it. On an unadopted road that’s often the residents jointly, or a management company if there is one, and your deeds or management agreement should say how costs are split. The council only maintains adopted roads. We’re happy to survey and quote for a group of residents together so everyone sees the same figures.

How do I report a pothole on a public road in Chelmsford?

Public roads in Chelmsford are maintained by Essex County Council through Essex Highways, and you can report defects on the Essex Highways website. We don’t repair adopted public roads for private customers, because that’s the highway authority’s job and you shouldn’t be paying for it.

What’s the difference between patching and resurfacing a road?

Patching cuts out and replaces individual failed areas on a road that’s otherwise sound. Resurfacing replaces the whole worn top layer when the cracking and wear are spread across the road but the base is still good. If the base itself has failed, neither will last, and the road needs digging out and rebuilding.

Can you repair the road without closing it completely?

Often, yes. We can work in sections with barriers and traffic management so residents and deliveries still get through, and we agree the schedule with you beforehand. Some jobs do need a short full closure, and we’ll tell you at the survey if yours is one of them.

Do you use hot or cold tarmac for road repairs?

Hot laid tarmac for every permanent repair, with a tack coat underneath and bitumen overbanding on the joints. Cold lay has its place as an emergency stopgap, but it doesn’t bond the way hot material does and it won’t last on a road that takes regular traffic.

How much does a road repair cost?

It depends on the area, the depth, whether the base needs rebuilding, the traffic management and access. We don’t publish a price because of that. The survey is free and no obligation, and you’ll get a fixed quote in writing. Call 01277 546016.

Get your free quote

Prefer to talk?

Mon-Fri 8:00-16:00, straight through to the team, not a call centre.

Exceptional Surfacing Contractors In Essex

Harrington Brothers have you covered no matter what your requirements may be. We are time served contractors with many works under our belts for clients in the residential and commercial sectors including local authorities.

Free quotes · Mon-Fri 8:00-16:00

Your Chelmsford driveway, done properly.

Call the office, or request a callback, we’ll come out, measure up and give you a fixed written quote.
Harrington Brothers Contractors Logo
Office Hours: Mon - Fri 8:00 - 16:00
01277 546016